TP15

Maintenance and storage of goods

The sheets are unloaded from transport onto a base in the construction site, which is a dais at least 20cm high from the ground and is made of cross girders placed at least at a meter?s distance from behind. It is advisable to transport sheets with derrick crane car. The sheets are generally packaged in the factory and are therefore easily liftable with the crane and frame. If no crane at your disposal, lift the sheets one by one. At this point, one should avoid the friction of sheets – they should be lifted, not pulled! The sharp cut edges of sheets can damage the finished coating of an underneath sheet.


In case of factory transportation, check immediately if there are any defects, possible omissions and damages, of which you should IMMEDIATELY inform the sales office of AS Toode. The signature of the person receiving the goods is binding, posterior claims are not considered. Each client has the right to be provided with AS Toode warranty terms and conditions on paper carrier. Do not use defective products!

Thin steel sheets may bend slightly, which is why they are to be handled with caution. Besides, the sheets are easily stretched. Sheets cannot be lifted being held by the two ends only! The sheets can be lifted to the roof using stable support beams and lifting these at many places. Possible scratches and other surface coating defects are removed with special aerosol paints.
The correction colours are not produced for matt polyester coating only!
The zinc-coated sheets cannot be stored outside being tightly packed. The sheets should be protected from direct precipitation and accumulation of moisture between the sheets.
The coloured and plastic-coated sheets can be stored without package during up to two weeks. When exceeding this period, follow the rules of storage of zinc-coated sheets.

Installation

Start the installation of sheets from the rightside edge of the wall or from the longest sheet (it allows to better line-up the sheet vertically / horizontally). The sheets should be installed cross-wise to the lower edge of the wall.
When working with sheets, do not use abrasive cutting tools!

Overlapping

It is common to make the side overlapping of corrugated sheet at up to half a wave. If the joint should be waterproof, it is advisable to make one-wave overlapping or to use longitudinal tile filler or mastics. Do not make one wave overlapping in case of zinc-coated sheets!
The end overlapping of sheets should be made at a place of lathing with at 100 mm. At the joint place, the screw fastening should be at the bottom of each wave.

Fastening

To fasten the sheets to wooden lathing use screws 4,8x25mm, with which the profile is screwed at the bottom of the wave. Suitable tool is a common electric or accumulator drill with clutch. The amount of screws is approximately 6 pc. per square meter. In the eaves and roof ridge, fasten the edges of the sheet at every second wave, at longitudinal joints of panel at the bottom of each wave and at the centre of the sheet to the side of every lathing in 2-3 places. For long or high buildings? cladding sheets, apply fastening screws according to the design.
Fasten side overlapping and flashings with screws or rivet fasteners, with spacing up to 500 mm.

Cleaning and maintenance

The steel crumb remaining after processing of the sheets has to be carefully cleaned with a brush. The crumb if it remains on the surface will rust and may cause damage to the sheet surface. The sheets that got wet can be cleaned with domestic detergents (do not use solutions and other strong chemicals). Read above on the general information on the maintenance. In case of damages to the top coat, use correction colours.